Skip to main content

Recently Updated Pages

4.8 | Start, Pause and Stop controls

T3RRA Operator's Manual 4 | Wizard

On the Surveying and Implementation screens, Start, Pause, and Stop control the beginning and end...

Updated 1 month ago by Sathya

4.7 | Markers

T3RRA Operator's Manual 4 | Wizard

Markers identify points of interest at user-selected locations on a design. A marker can also ser...

Updated 1 month ago by Sathya

4.6 | GPS Data

T3RRA Operator's Manual 4 | Wizard

The GPS information button is in the lower-right corner of the screen. It shows your current lati...

Updated 1 month ago by Sathya

4.3 | Zoom Controls

T3RRA Operator's Manual 4 | Wizard

There are several ways to zoom the map. Pinch to zoom Use a two-finger pinch on the screen: move ...

Updated 1 month ago by Sathya

3.6 | Advanced Settings Tab

T3RRA Operator's Manual 3 | Settings

Advanced tab in Settings. Logging Enable GPS data log Keeping this enabled is highly recommended....

Updated 1 month ago by Sathya

3.5 | GPS Port Settings Tab

T3RRA Operator's Manual 3 | Settings

GPS connection settings GPS settings with Raw GPS Data displayed. GPS displays the COM port used ...

Updated 1 month ago by Sathya

3.4 | Limits Tab

T3RRA Operator's Manual 3 | Settings

Blade shift increment Blade Shift Increment sets the height adjustment applied by the up/down ele...

Updated 1 month ago by Sathya

3.3 | Project Tab

T3RRA Operator's Manual 3 | Settings

Project tab in Settings. Changes in the Project tab do not apply to a project that is already ope...

Updated 1 month ago by Sathya

3.2 | Machine Tab

T3RRA Operator's Manual 3 | Settings

Machine tab settings. Look ahead delay time To control blade height, the software receives an ele...

Updated 1 month ago by Sathya

2.5 | Saving and Auto-Saving Projects

T3RRA Operator's Manual 2 | Creating Projects

Saving a project retains its survey, design and other associated data so you can close T3RRA soft...

Updated 1 month ago by Sathya

2.3 | Importing Data

T3RRA Operator's Manual 2 | Creating Projects

The native project format for T3RRA software is the T3RRA Project File ( .tci). Before using data...

Updated 1 month ago by Sathya

2.2 | Importing External Files

T3RRA Operator's Manual 2 | Creating Projects

T3RRA software uses the T3RRA Project File ( .tci) as its native project format. Data from suppor...

Updated 1 month ago by Sathya

2.1 | Main page / New Project Page

T3RRA Operator's Manual 2 | Creating Projects

The Main Page appears when T3RRA software opens and when you select New Project within the Wizard...

Updated 1 month ago by Sathya

1.11 | Glossary

T3RRA Operator's Manual 1 | General

As-Applied: The field's current state as work progresses, also called As-Built. As earthworks are...

Updated 1 month ago by Sathya

1.9 | Updating T3RRA Software

T3RRA Operator's Manual 1 | General

T3RRA releases regular software updates to improve reliability, add features and enhance compatib...

Updated 1 month ago by Sathya

1.7 | System Startup

T3RRA Operator's Manual 1 | General

Starting T3RRA Software Most installations are configured to start T3RRA software automatically w...

Updated 1 month ago by Sathya

1.6 | How T3RRA Software Works with John Deere iGrade™

T3RRA Operator's Manual 1 | General

John Deere iGrade™ is integral to the T3RRA machine-control solution. T3RRA software provides ter...

Updated 1 month ago by Sathya

1.5 | Consider the System as a Whole

T3RRA Operator's Manual 1 | General

Accurate machine control relies on the entire landforming system, not on T3RRA software alone. T3...

Updated 1 month ago by Sathya

1.4 | Choosing an In-cab Tablet PC

T3RRA Operator's Manual 1 | General

Compatible hardware and display T3RRA in-cab software runs on any 64-bit Windows 11 PC, whether a...

Updated 1 month ago by Sathya

1.3 | Intended Use

T3RRA Operator's Manual 1 | General

Supported equipment and tasks Use T3RRA In-cab Software on supported construction, landforming an...

Updated 1 month ago by Sathya