8 | Implementation screen
8.1 | The Implementation Screen
When you begin implementation of your design, the display will show a cut/fill map as well as too...
8.2 | Setting Zero
Important: Before work can begin, the system must be “zeroed”. Both the T3RRA software and iGrade...
8.3 | Cross-slope Adjustment
T3RRA software is capable of sending cross slope commands to iGrade™. It can operate automaticall...
8.4 | Vertical blade shift
The blade shift buttons in T3RRA Cutta and T3RRA Ditch serve to manually shift the height of the ...
8.5 | Cut/Fill information display
In the upper left corner of the screen more information is shown about current ground height, des...
8.6 | Progress bars
In the upper right of the screen are 2 percentage counters that show the amount completed. These ...
8.7 | On-grade indicator
At the left side of the map screen there is a grouping of up/down chevrons that show the current ...
8.8 | Blade and Tractor Indicators
GPS status indicators When you are implementing a design, each implement will appear as a triangl...
8.9 | Map Display
When implementing the display will show a cut/fill map by default. The Cut/fill map will be displ...
8.10 | Drain Profile
Displaying the drain profile When implementing a drain you are able to bring up a display on the ...