Skip to main content

ECU Installation

ECU Connections Overview

 

Option 1: In-cab

Being mounted in cab will provide access to the following for the T3H-C002 ECU breakout harness:

    Tablet Arm/Engage Switch 4-way ISOBUS connection from Greenstar ISO harness Diagnostic ports for tractor CAN access Power via convenience plug or power strip Joystick Valve output connections to JD legacy inputs or Case EHR inputs

    Cabling will need to be run outside of the cab if:

      Proportional solenoid or Danfoss PVE valve cabling must be run out to an external valve block

      Option 2: Rear-panel 

      Option 3: Rear ISOBUS 

      Option 2: Rear-panel 

      Recommended in these situations 

      Option 3: Rear ISOBUS 

      Recommended in these situations 

      Mechanical mountingMounting

      (Magnet,

      Magnets

      Rivnuts)

      Rivnuts


      Mounting orientation 

      T3H-C002

      Connecting the ECU Breakout Harness connection and routing