Drain Design error message ‘drains were affected by this operation’ Symptoms : When designing a drain, you receive an error message: Cause : Elevation data was collected from low to high elevation where another drain connects. Drain was split with the Split Drain tool. Solutions : Swap AB before designing so the drain is designed from high to low elevation.